Wednesday, August 17, 2011

Construction Stop Motion

Construction Stop Motion On YouTube.





And 'den to keep the flow of water from the jet in a nearby town. The trench is 50 feet wide and will stretch 4.5 miles. The pipe is a 18 "precast concrete pipes. Every mile there is a 19 'water line that connects the principal at a turning point that the closure of water to the filters with the Atlantic Ocean. Maitani for you is a 40 "valve chamber, 120" tree connection. There are no lines in the city, will also need to run pipe to the city. This isuse watershed 20 4'x4 'that run a block for 10 miles. Connecting to the catchment area is a 3 'iron pipe, which is to connect a 3 "diameter main pipeline that is on a 10 for 4 miles' stretch the 10 miles to the hose will reach 12" to be. For each key is a 12 "blow-off chamber. For the 4 miles there are 12 to be" piping. Every mile will need two 2'x4 'catch basin on each side of the road. Connecting the tank to the 12 'main line pipe steel is 3' of iron. Oncereached the watershed is a 180-degree turn, the pipe will be divided into 4 parts. On the main line is a 4-seam section, 8 feet of run 3 "pipes. At the end of the three pipes each pipe pipe", 3 'We are dirty with project costs. 86 million.

Tags: Construction, Stop, Motion, excavators, excavator, cranes, trucks, cars, diesel, gas

wicker basket with liner cat tree carpet

No comments:

Post a Comment